Saturday, November 28, 2009

SPRINT ONE

ROLE AND DUTIES
In the first sprint, i was been chosen as a technical specialist as my role. My duty was to create and update the website followed by the schedule and was assigned to create the main blog, design a banner for header, a brand new themes and layout design of the blog. Besides that, i have to compile each of the member's blog into the listed column and arrange the column to be filled by the contents.

No comments:

Post a Comment