From the sprint 2, i learned how to elaborate form of picture writing. It was deliberately kept complicated so that not many people could master it and scribes could keep their special position.We could be written from left to right, right to left, or top to bottom. Besides that, i learned that scribes used a different form of writing (script), called hieratic, which was a fast-written version of hieroglyphs, always running from right to left for business contracts, letters, and stories. Furthermore, an even more rapid script evolved, called demotic.
Tuesday, December 22, 2009
SPRINT TWO
ROLE AND DUTIES
In the second sprint, i was been chosen as a scribe as my role. It was a task that a person who serves as a professional copyist, esp. one who made copies of manuscripts before the invention of printing. Besides that, i have to compile all the data and post it on the blog.
In the second sprint, i was been chosen as a scribe as my role. It was a task that a person who serves as a professional copyist, esp. one who made copies of manuscripts before the invention of printing. Besides that, i have to compile all the data and post it on the blog.
Sunday, December 20, 2009
Urgent!!! Pls take note
Gerald mention that individual blog need consist of description of the individual task, the work u done, and include what did u learn through each sprint. For those who had done, pls try to improve. First sprint add on 1 more posting, sprint two 2 posting. Main blog pls take more importants on writing instead of picture and video. thank you.
From: Temporary leader representative, leader tey arn chee pc line sucks cant do the posting.
For the BKS activity, make sure you read the task sheet and ensure that you complete the requirements stated.
1) Blog content
2) 2 summary postings on the completed sprints
3) A review of the experience and reflection, with reference to theories and concepts covered.
4) Team leader's wrap-up reflection.
So there should be a total of 2 + 1 +[1] blog postings. THere is no need for any content postings on KM in your personal blog as your task is to develop the BBKM blog and use your PERSONAL blog as a notepad for your summary and reflection.From: Temporary leader representative, leader tey arn chee pc line sucks cant do the posting.
Saturday, November 28, 2009
Lesson Learned
Continuous Learning
As i am creating and designing the blog, i found that i have to understand the entire blog system including the function, the relationship among all member's task and role before i chosing the layout for the blog. It could be a main element to assist or maybe an obstacle for the others in completing each sprint. After identify each role, i have to ensure all the members able to use the blog as easy as they could. To do all this, i need to acquire new skills and knowledge from e-learning and apply them on my task. Sharing is caring, i will also share the information with other members.
As i am creating and designing the blog, i found that i have to understand the entire blog system including the function, the relationship among all member's task and role before i chosing the layout for the blog. It could be a main element to assist or maybe an obstacle for the others in completing each sprint. After identify each role, i have to ensure all the members able to use the blog as easy as they could. To do all this, i need to acquire new skills and knowledge from e-learning and apply them on my task. Sharing is caring, i will also share the information with other members.
SPRINT ONE
ROLE AND DUTIES
In the first sprint, i was been chosen as a technical specialist as my role. My duty was to create and update the website followed by the schedule and was assigned to create the main blog, design a banner for header, a brand new themes and layout design of the blog. Besides that, i have to compile each of the member's blog into the listed column and arrange the column to be filled by the contents.
Subscribe to:
Posts (Atom)